Introduction / FirstSpirit ServerManager / Schedule entry planning / Project-based actions / Repair references

Repair references

If there are incorrect references in a project, a recalculation of the references in the project can be started using this action. After staring the project schedule entry, the message “Schedule entry completed successfully.” appears. The reference calculation at this point in time was already started, but does not have to be completed yet. Calculating the references takes place in the background and can take some time depending on the size of the project.

© 2005 - 2024 Crownpeak Technology GmbH | All rights reserved. | FirstSpirit 2024.13 | Data privacy